LESCO Introduces New Rules for Net Metering in Lahore

LESCO Introduces New Rules for Net Metering in Lahore

Lahore Electric Supply Company (LESCO) has announced new regulations for all net metering installations across Lahore and surrounding regions. These rules aim to address the rising issue of substandard and unregistered solar inverters being connected to the grid, which poses serious safety and compliance risks.

For consumers already managing their electricity records online, related services such as lesco online bill check remain unaffected by the new policy changes.

Why LESCO Has Updated Net Metering Rules?

LESCO’s enforcement teams reported an increase in cases where consumers installed low-quality or unverified inverters during solar system setup. These inverters often fail to meet grid-synchronization standards, which can lead to:

• power quality issues
• safety hazards
• reverse-flow inconsistencies
• incorrect units being pushed back into the grid

To prevent these problems, LESCO has shifted toward a stricter verification process focusing directly on inverter origin, serial tracking, and manufacturer details.

New Requirements for Net Metering Approval

LESCO has now made the following steps mandatory for all new net metering applications:

1. Mandatory Registration of Inverter Number + Company Name

Consumers must submit the exact inverter serial number and the official company/manufacturer name during meter allocation.
LESCO will record this information permanently inside its ERP system.

2. Inverter Number Required With Demand Notice

Meter allocation will not proceed unless the inverter’s serial number is provided along with the demand notice documents.

3. Company-Filed Inverter Lists Become Official Record

The lists submitted by solar installation companies — containing inverter model numbers and serials — will be treated as verified documents and stored in LESCO’s records.

4. Physical Verification at Time of Meter Installation

LESCO teams will cross-check the inverter number on-site before installing the net metering meter.
If the number does not match the recorded entry:

The meter will NOT be installed.

What This Means for Solar Consumers

LESCO’s new rules are designed to ensure that only certified, safe, and grid-compatible solar inverters are connected to the system. Consumers who follow proper documentation will face no delays.

This change will:

• improve grid safety
• prevent unapproved or counterfeit equipment
• standardize net metering installation practices
• reduce future disputes over inverter compliance

For solar users who regularly manage their billing or meter data online, services such as lesco online bill check continue to function normally.

Final Thoughts

LESCO’s updated net metering rules aim to strengthen compliance, protect grid stability, and enforce transparency in solar installation projects. Anyone planning to apply for net metering must ensure their inverter serial numbers, brand details, and paperwork are accurate and verified before submitting a request. This reduces the chances of rejection and ensures smooth meter installation.

What changed in LESCO’s 2025 net metering rules?

LESCO now requires every net metering application to include the inverter company name and serial number. These details must be entered into the ERP system and match the numbers checked at the time of meter installation.

Why is LESCO verifying inverter serial numbers?

LESCO introduced inverter verification after discovering substandard or unregistered inverters in solar systems. The new rule ensures only approved and compliant equipment connects to the grid.

What happens if the inverter number is missing?

If the inverter number is not provided with the demand notice, LESCO will cancel the meter allocation request. No meter is issued without verified inverter details.

Will LESCO reject mismatched inverters?

Yes. If the inverter number recorded in the ERP system does not match the inverter inspected during installation, LESCO will refuse to install the net metering meter.

How can consumers ensure compliance?

Consumers must submit accurate inverter details, keep the original invoice, and verify that the serial number matches the physical unit to avoid delays or rejection.

FAQs

Why did LESCO change the net metering rules for 2025?

LESCO updated its rules to stop the use of substandard or unregistered inverters. The new system ensures grid safety by verifying inverter company names and serial numbers before any meter is issued.

Do I need to provide inverter details with my net metering application?

Yes. LESCO now requires the inverter serial number and brand name along with your demand notice. Missing information leads to cancellation of meter allocation.

How does LESCO verify inverter details?

The inverter serial number is entered into the ERP system and later cross-checked at the time of meter installation. Any mismatch results in rejection.

What happens if my inverter number does not match?

LESCO will refuse to install the meter and you’ll need to reapply with corrected or verified equipment.

Where can I check my LESCO bill online?

You can verify your monthly consumption or access your latest bill using the official lesco online bill check system.